EnglishFrançais

Newsflash

August_2008

Starting in August 2008, "the study to evaluate the implementation of sustainable development: developing tools for assessing economic costs of environmental degradation and calculating the environmental cost of public investment for development economic and social sectors of agriculture, industry, transport and tourism. "

Click image to open!

Read more...
 
August 2008
Starting in August 2008, Study "Aquaculture in Tunisia and potential environmental impacts of development "
 
Click image to open!
Click image to open!
 
Read more...
 
April 2008
Starting in April 2008, "the study of preparing the Second National Communication of Tunisia under the United Nations Framework Convention on Climate Change"
 
Click image to open!
 
Read more...
 
March 2008

Starting in March 2008, "The Study of Impact Assessment (SIA) and an environmental management plan (EMP) on railway maintenance facilities of the Grand Depot Farhat Hached (GDFH) in Tunis and Filing Workshop Bordj Cedria (DABC)"

Click image to open!
Read more...
 
9-11 Novembre 2007
GEREP-Environment was present at the Environmental Fair Green Afriqiya from 9 to 11 November 2007 at the International Fair Kram.At Booth No. 309.
Click image to open!

Read more...
 
November 2007
Starting in November 2007, "the study developed three specifications related to the creation, development of green spaces, the maintenance of green areas and the normalization of the production and marketing of ornamental plants Tunisia", on behalf of the Ministry of the Environment and Sustainable Development in Tunisia
Click image to open!

Read more...
 
July 2007
Starting in July 2007, "the study management and restoration of sites contaminated by asbestos waste and strengthening the legislative and normative aspect in the matter", for the Ministry of the Environment and Sustainable Development in Tunisia
 
Click image to open!

Read more...
 

Companies Group

recajetlogo.gif
Printer cartridges high quality at half price.
www.reca.com.tnperfect.gif







Our office of continuing training.
www.perfect-formation.com

   
header-sample.png

Home arrow References arrow Technical assistance
Technical assistance PDF Print E-mail
  • Technical assistance for monitoring the execution of works and establishment of the centre reckonings sorting garbage Sousse lot of large civil engineering and equipment (ANPE) - Cost of Work: 2.3 Million DT
  • Technical assistance for monitoring the performance of the work and preparation of accounts of the Centre International des Technologies de l'Environnement de Tunis - CITET - Lot Civil Engineering and lots techniques (Electrical, plumbing, air conditioning, VRD)
  • Technical assistance for monitoring the performance of the work and preparation reckonings of the wastewater treatment plant of the Tannery Mornaguia - Lot Civil Engineering and Facilities - Costs of work: 500 MDT
  • Technical assistance for monitoring the performance of the work and preparation reckonings of the wastewater treatment plant of the Tannery Mégisserie the maghreb - Lot Civil Engineering and Facilities
    Traitement Physico-chimique + Traitement à boues activées + Traitement mécanique des boues; Physico-Chemical + Treatment Activated sludge treatment + mechanical sludge
    Cost: DT 1.2 Million
 
gerep-environnement.com © All rights reserved
17, Rue Mustafa Abdessalem 2037 El Menzah V - Tunis - Tunisie
Tél.: (+216) 71 752 976 - Fax : (+216) 71 234 825
Created and designed by Ideal Conception